Using CANCRET for your construction project

A conventional timber-frame structure is being planned and put out to bid. These elements will be cast horizontally at a locally selected timber-frame builder’s site—using CANCRET’s patented Hempcrete mixture and mobile mixing plant. This allows for the production of approximately 50 square meters per day.

The highlight: the mixing plant comes to the element and the added value remains with the timber manufacturer. This strengthens the ecosystem and reduces transportation routes.

Alternatively, we offer production at our facility in Nenzing, Austria.

→ Contact us for a no-obligation consultation.